Commercial-Grade PVC Inflatables

Our comprehensive range of waterpark tubes, rafts, and accessories are designed for commercial use, featuring premium materials and custom branding.

Single Rider Waterpark Tube

Single Rider Tube

Engineered for solo excitement, this single-rider tube features a durable design with reinforced handles and high-flow valves for quick inflation and deflation. Compact yet robust, it delivers a smooth, controlled ride with the perfect balance of comfort and performance.

Double Rider Waterpark Tube

Double Rider Tube

Designed for shared thrills, the double tube offers the same strength and performance as the single model. Reinforced handles and independent air chambers ensure stability, comfort, and reliability ride after ride.

6-Person Waterpark Raft

Triple Rider Tube

Built for ultimate group adventures, the triple tube combines high performance with safety and durability. Its multi-rider configuration and reinforced construction deliver excitement and stability, making it a favorite for slides that call for speed and teamwork.

6-Person Waterpark Raft

Cloverleaf Tube

Engineered for both excitement and reliability, the Cloverleaf Tube features four independent air chambers that ensure superior stability throughout the ride. Even in the unlikely event of a puncture, the remaining chambers maintain buoyancy, carrying riders safely and smoothly to the finish. Designed for performance, safety, and lasting fun ride after ride.

6-Person Waterpark Raft

72"-96" Rafts (4-8 Person)

Designed for group thrills, these large diameter rafts feature a robust multi-chamber design that enhances both performance and safety. Engineered for parks that demand reliability, comfort, and unforgettable shared experiences..

Waterpark Tube Accessories Kit

Accessories Kit

Complete set of handles, valves, repair kits, patches, and adhesives for maintenance.

Our Process

A streamlined five-step process to take your order from concept to delivery with full transparency.

1

Request for Quote

Share your product specifications, branding requirements, and delivery preferences with our team.

2

Sampling

Receive product samples within 10–14 days for evaluation and approval before full production begins.

3

Production

Manufacturing begins with a 3–5 week lead time using certified, commercial-grade materials.

4

Quality Control

Strict inspections including 48-hour inflation tests, with full QC documentation provided.

5

Logistics & Delivery

Flexible global shipping terms (EXW, FOB, CIF, DDP) with complete logistics coordination.

WhatsApp